Learn more about our infrastructure via a virtual tour
Great location
Everything for relaxation
Bars and restaurants
Sport and health
Everything for work
In an exclusive area that offers everything for a comfortable life and recreation:
700 m from Bang Tao Beach
2 km to the national park
20 minutes to the airport
10 minutes to the exclusive Laguna area
More than 6,000 m² of dedicated infrastructure for a comfortable stay:
lobby and reception
24-hour concierge service
walking areas
swimming pools: main, kids with water slides and attractions, private pools
2-storey restaurant
sports bar for watching matches with local and imported beer
healthy food bar
pool bar
gym
spa center — more than 1,000 m²
co-working
conference rooms
exhibition spaces
Great location
Everything for relaxation
Bars and restaurants
Sport and health
Everything for work
Apartments are now on sale with a 60% discount
Construction progress
0%
completed
100%
December 2022 — May 2023
1
Planning phase
Obtaining the necessary documents: building permit, EIA certificate. Holding a tender for selecting the general contractor for design, architecture, and engineering networks. Preparation of a construction organization plan.
Construction of all buildings and interior partitions, elevator shafts and stairwells. Installation of decorative and facade panels.
January 2025 — March 2025
4
Rough finishing work
Rough finishing of all apartments. Laying of engineering communications. Ceiling structure installation. Facade works. Roof waterproofing and thermal insulation.
April 2025 — August 2025
5
Fine finishing work
Tiling, wall painting. Elevator installation. Pool cladding. Built-in furniture installation.
September 2025 — October 2025
6
Landscaping
Landscaping. Facade landscaping, arranging plants on the territory.
November 2025 — December 2025
7
Moving-in preparation
Furniture installation, plumbing, lighting. Checking the work of engineering communications. Putting the building into operation. Launch of the hotel.
1
Planning phase
December 2022 — May 2023
Obtaining the necessary documents: building permit, EIA certificate. Holding a tender for selecting the general contractor for design, architecture, and engineering networks. Preparation of a construction organization plan.
More
2
Underground construction phase
June 2023 — February 2024
Obtaining the necessary documents: building permit, EIA certificate. Holding a tender for selecting the general contractor for design, architecture, and engineering networks. Preparation of a construction organization plan.
More
3
Construction phase
March 2024 — December 2024
4
Rough finishing work
January 2025 — March 2025
5
Fine finishing work
April 2025 — August 2025
6
Landscaping
September 2025 — October 2025
7
Moving-in preparation
November 2025 — December 2025
Create a reliable source of income or live in your apartment by the sea
Become the owner of a luxury investment property — sign up for a free consultation or download our detailed project presentation