Phase 2
Designer apartments — from 36.72 m² and $184,899
Thoughtful layout, premium furniture, decor, water and electricity-saving systems
LAYAN GREEN PARK isn't just square meters, it's a lifestyle
Great location
Everything for relaxation
Bars and restaurants
Sport and health
Everything for work
An affluent neighborhood with everything you need for a comfortable life and recreation:
700 m from Bang Tao Beach
2 km to the national park
20 minutes to the airport
10 minutes to the exclusive Laguna area
More than 6,000 m² of dedicated infrastructure for a comfortable stay:
Lobby and reception
24-hour concierge service
Walking areas
Swimming pools: main, kids with water slides and attractions, private pools
2 restaurants
3 bars
2 cafes
Terrace Food Court
Gym
Spa center — more than 1,000 m²
Coworking Space
Conference hall 300 sq.m.
3 meeting rooms
Exhibition spaces
Great location
Everything for relaxation
Bars and restaurants
Sport and health
Everything for work
Apartments are now on sale with a 30% discount
Construction progress
0%
completed
100%
December 2022 — May 2023
1
Planning phase
Obtaining the necessary documents: building permit, EIA certificate. Holding a tender for selecting the general contractor for design, architecture, and engineering networks. Preparation of a construction organization plan.
Rough finishing of all apartments. Laying of engineering communications. Ceiling structure installation. Facade works. Roof waterproofing and thermal insulation.
April 2025 — August 2025
5
Fine finishing work
Tiling, wall painting. Elevator installation. Pool cladding. Built-in furniture installation.
September 2025 — October 2025
6
Landscaping
Landscaping. Facade landscaping, arranging plants on the territory.
November 2025 — December 2025
7
Moving-in preparation
Furniture installation, plumbing, lighting. Checking the work of engineering communications. Putting the building into operation. Launch of the hotel.
1
Planning phase
December 2022 — May 2023
Obtaining the necessary documents: building permit, EIA certificate. Holding a tender for selecting the general contractor for design, architecture, and engineering networks. Preparation of a construction organization plan.
More
2
Underground construction phase
June 2023 — February 2024
Pit development. Construction of piles. Foundation works. Construction of underground parking and basements. Laying of water supply systems.
More
3
Construction phase
March 2024 — December 2024
Construction of all buildings and interior partitions, elevator shafts and stairwells. Installation of decorative and facade panels.
More
4
Rough finishing work
January 2025 — March 2025
5
Fine finishing work
April 2025 — August 2025
6
Landscaping
September 2025 — October 2025
7
Moving-in preparation
November 2025 — December 2025
Phase 2 — online camera