Learn more about our infrastructure via a virtual tour
Great location
Everything for relaxation
Bars and restaurants
Sport and health
For children
In an exclusive area that offers everything for a comfortable life and recreation:
700 m from Bang Tao Beach
2 km to the national park
20 mins to the airport
10 minutes to the exclusive Laguna area
More than 4,500 m² of dedicated infrastructure for a comfortable stay:
lobby and reception
24-hour concierge service
walking areas
1,500 sq. m. with swimming pools: central, kids, private pools
2 restaurants
pool bar
rooftop bar
gym
outdoor yoga terrace
outdoor sports ground
running track
spa and sauna
children's center with animators and games
playgrounds
swimming pools
interest sections
Great location
Everything for relaxation
Bars and restaurants
Sport and health
For children
After commissioning, the price will increase by 10-15%
Construction progress
0%
completed
100%
January 2020 — September 2020
1
Planning phase
Obtaining the necessary documents: building permit, EIA certificate. Holding a tender for selecting the general contractor for design, architecture, and engineering networks. Preparation of a construction organization plan.
Rough finishing of all apartments. Laying of engineering communications. Ceiling structure installation. Facade works. Roof waterproofing and thermal insulation.
Furniture installation, plumbing, lighting. Checking the work of engineering communications. Putting the building into operation. Launch of the hotel.
1
Planning phase
January 2020 — September 2020
Obtaining the necessary documents: building permit, EIA certificate. Holding a tender for selecting the general contractor for design, architecture, and engineering networks. Preparation of a construction organization plan.
More
2
Underground construction phase
October 2020 — May 2021
Pit development. Construction of piles. Foundation works. Construction of underground parking and basements. Laying of water supply systems.
More
3
Construction phase
June 2021 — June 2022
Construction of all buildings and interior partitions, elevator shafts and stairwells. Installation of decorative and facade panels.
More
4
Rough finishing work
July 2022 — December 2022
Rough finishing of all apartments. Laying of engineering communications. Ceiling structure installation. Facade works. Roof waterproofing and thermal insulation.
More
5
Fine finishing work
January 2023 — June 2023
Tiling, wall painting. Elevator installation. Pool cladding. Built-in furniture installation.
More
6
Landscaping
July 2023 — September 2023
Landscaping. Facade landscaping, arranging plants on the territory.
More
7
Moving-in preparation
October 2023 — November 2023
Phase 1 — online camera
Watch in real time how we create luxury investment properties
Create a reliable source of income or live in your apartment by the sea
Become the owner of a luxury investment property — sign up for a free consultation or download our detailed project presentation