Menu
Download presentation
 ▼
By submitting an application, you consent to the processing of your personal data
Download presentation
All you need to know about the project — in one document
LAYAN GREEN PARK Developer
Official website of LAYAN GREEN PARK aparthotel
Phase 1
completionQ4 2023
Phuket, Thailand

Investment property from $163,099

Earnings — from 7% per annum
Phuket, Thailand

Benefits of the LAYAN GREEN PARK aparthotel

Earnings
from 7% per annum
Apartments
from $163,099
700 m from
Bang Tao Beach
EDGE Green Certification
End of construction
in Q4 2023
Project video presentation

LAYAN GREEN PARK is the first eco and family-friendly premium aparthotel

Project master plan

Phase 1
Phase 2
Phase 1
Phase 2
Move left or right
Phase 1

Designer apartments — from 30.32 m² and $163,099

Thoughtful layout, premium furniture, decor, water and electricity-saving systems

LAYAN GREEN PARK isn't just square meters, it's a lifestyle

Great location
Everything for relaxation
Bars and restaurants
Sport and health
For children
An affluent neighborhood with everything you need for a comfortable life and recreation:
  • 700 m from Bang Tao Beach
  • 2 km to the national park
  • 20 mins to the airport
  • 10 minutes to the exclusive Laguna area
More than 4,500 m² of dedicated infrastructure for a comfortable stay:
  • Lobby and reception
  • 24-hour concierge service
  • Walking areas
  • 1,500 m² with swimming pools: central, kids, private pools
  • 2 restaurants
  • Pool bar
  • Rooftop bar
  • Gym
  • Outdoor yoga terrace
  • Outdoor sports ground
  • Running track
  • Spa and sauna
  • Children's center with animators and games
  • Playgrounds
  • Swimming pools
  • Interest sections
Great location
Everything for relaxation
Bars and restaurants
Sport and health
For children

After commissioning, the price will increase by 10-15%

Construction progress
0%
completed
100%
January 2020 — September 2020
1
Planning phase
Obtaining the necessary documents: building permit, EIA certificate. Holding a tender for selecting the general contractor for design, architecture, and engineering networks. Preparation of a construction organization plan.
More
October 2020 — May 2021
2
Underground construction phase
Pit development. Construction of piles. Foundation works. Construction of underground parking and basements. Laying of water supply systems.
More
June 2021 — June 2022
3
Construction phase
Construction of all buildings and interior partitions, elevator shafts and stairwells. Installation of decorative and facade panels.
More
July 2022 — December 2022
4
Rough finishing work
Rough finishing of all apartments. Laying of engineering communications. Ceiling structure installation. Facade works. Roof waterproofing and thermal insulation.
More
January 2023 — June 2023
5
Fine finishing work
Tiling, wall painting. Elevator installation. Pool cladding. Built-in furniture installation.
More
July 2023 — September 2023
6
Landscaping
Landscaping. Facade landscaping, arranging plants on the territory.
More
October 2023 — December 2023
7
Moving-in preparation
Furniture installation, plumbing, lighting. Checking the work of engineering communications. Putting the building into operation. Launch of the hotel.
More
1
Planning phase
January 2020 — September 2020
2
Underground construction phase
October 2020 — May 2021
3
Construction phase
June 2021 — June 2022
4
Rough finishing work
July 2022 — December 2022
5
Fine finishing work
January 2023 — June 2023
6
Landscaping
July 2023 — September 2023
7
Moving-in preparation
October 2023 — December 2023
Furniture installation, plumbing, lighting. Checking the work of engineering communications. Putting the building into operation. Launch of the hotel. More
Phase 1 — online camera

Monitor your apartment's construction in real time

Become the owner of a luxury investment property by the sea

Sign up for a viewing and get a free project consultation
 ▼
By submitting an application, you consent to the processing of your personal data