
Construction completed

Investment property from $145,265
Start earning from completed units today
We'll tell you more!
We'll send you a personal offer and detailed information about our projects
Benefits of the LAYAN GREEN PARK aparthotel
Returns
7-10% annually*
7-10% annually*
Apartments
from $145,265
from $145,265
Two minutes from
Layan Beach
Layan Beach
EDGE Green Certification
Construction
completed
completed
Project video presentation
LAYAN GREEN PARK is a Phuket's first EDGE-certified, family-friendly, eco-conscious premium apart-hotel
Project master plan
Phase 1
Phase 2
Phase 1
Phase 2
Phase 1
Completed apartments — from 30.32 m² and $145,265
Thoughtful layouts, premium furnishings and fixtures, designer décor, Smart Home integration, and built-in water and energy efficiency
LAYAN GREEN PARK isn't just square meters, it's a lifestyle
Great location
Everything for relaxation
Bars and restaurants
Sport and health
For children
An affluent neighborhood with everything you need for a comfortable life and recreation:
- 2 minutes from Layan Beach
- 2 km to the national park
- 20 mins to the airport
- 10 minutes to the exclusive Laguna area
More than 4,500 m² of dedicated infrastructure for a comfortable stay:
- Lobby and reception
- 24-hour concierge service
- Walking areas
- 1,500 m² with swimming pools: central, kids, private pools
- 2 restaurants
- Pool bar
- Rooftop bar
- Gym
- Outdoor yoga terrace
- Outdoor sports ground
- Running track
- Spa and sauna
- Children's center with animators and games
- Playgrounds
- Swimming pools
- Interest sections
Great location
Everything for relaxation
Bars and restaurants
Sport and health
For children
Construction is complete. Get your keys and start earning rental income today
Construction progress
0%
completed
100%

January 2020 — September 2020
1
Planning phase
Obtaining the necessary documents: building permit, EIA certificate. Holding a tender for selecting the general contractor for design, architecture, and engineering networks. Preparation of a construction organization plan.
More
October 2020 — May 2021
2
Underground construction phase
Pit development. Construction of piles. Foundation works. Construction of underground parking and basements. Laying of water supply systems.
More
June 2021 — June 2022
3
Construction phase
Construction of all buildings and interior partitions, elevator shafts and stairwells. Installation of decorative and facade panels.
More
July 2022 — December 2022
4
Rough finishing work
Rough finishing of all apartments. Laying of engineering communications. Ceiling structure installation. Facade works. Roof waterproofing and thermal insulation.
More
January 2023 — June 2023
5
Fine finishing work
Tiling, wall painting. Elevator installation. Pool cladding. Built-in furniture installation.
More
July 2023 — September 2023
6
Landscaping
Landscaping. Facade landscaping, arranging plants on the territory.
More
October 2023 — December 2023
7
Moving-in preparation
Furniture installation, plumbing, lighting. Checking the work of engineering communications. Putting the building into operation. Launch of the hotel.
More
1
Planning phase
January 2020 — September 2020
2
Underground construction phase
October 2020 — May 2021
3
Construction phase
June 2021 — June 2022
4
Rough finishing work
July 2022 — December 2022
5
Fine finishing work
January 2023 — June 2023
6
Landscaping
July 2023 — September 2023
7
Moving-in preparation
October 2023 — December 2023
Furniture installation, plumbing, lighting. Checking the work of engineering communications. Putting the building into operation. Launch of the hotel.
More
Follow the Phase 1 journey — from breaking ground to a fully realized lifestyle
Become the owner of a luxury investment property by the sea
Sign up for a viewing and get a free project consultation